Having worked with 4Com for a number of years, CES Electrical were tasked to supply and install a new Himoinsa 600 kVA generator for their brand new 10-storey office block in Bournemouth. Along with sourcing a suitable generator and auto transfer panel, requiring installation on the roof of the new 4Com building meant that our team had to design and install a load spreading frame. After using a crane to lift and position the generator onto the rooftop in Bournemouth, all work was completed on schedule and to budget.